免费又黄又硬又爽大片_差差很疼大全软件_性欧美viubeos另类12_赵茹珍未删减大尺度

中文
Railway freight metering products - overload detection devices

Overloads are mainly installed at formation stations, section stations, and entry and exit signal locations at stations with cargo inspection operations. Used to determine if a railroad car is overloaded and off-loaded. It is an important equipment for the National Railway Group to control the safety of railway freight. The product is divided into normal over-deflection load applicable to trains of 60km/h and high speed over-deflection load of 100km/h. The over- and off-load detection device is mainly for monitoring and warning the over-weight, off-weight and off-load loading status of key cargoes (such as: coiled steel, glass, alumina, heavy rail, etc.) that are prone to tumbling, breaking, collapsing and crosstalk during railway wagon transportation, to prevent and eliminate to freight safety belt.

Procurement Consultancy

Email:huoanhr@yunda-tec.com

image_1630389561_Iek4Erk8.jpg